Through the developed process of Energy efficient mixed bed Double RO from the desert’s generous heart we made a dream come true in khatoon abad cooper refinery by means of  treating saline water into DM water.

Owner / Client / Consultant:

Khatoon Abad Cooper Refinery Complex / National Iranian Copper Industries Company  / Fakoor Sanat Tehran Co.

Location / Completion Year / Duration: Khatoon Abad – Kerman Province – Iran / 2016/ 6 month

Contract Type: EPC

Represented Solution in This Project:

Main Solution:

  • Desalination

Supplementary Solutions:

  • Electrical and Instrument / all LV, MV & MCC Panel, done by Absun Madar CO.

Complementary Services:

  • O&M Operation and Maintenance
  • Procurement / Directly from 9 different countries including 15 International Companies
  • Laboratory Testing Services / 8 time sampling for more than 14 Parameters

Employed Process and Technology:

  • BWRO Pass 1 & 2/ Capacity: 720 m³/day
  • MIX BED / Capacity: 720 m³/day
  • System Recovery : 85%

 

Fluid Characteristic:

  Feed Product
Well Water DM Water
Flow Rate 850 m³/day 720 m³/day
Pressure (at 25 °C) 16 bar
Water Reaction (pH) 8 7-9
Total dissolved solids (TDS) 329 mg/L < 1 mg/L
Total hardness (TH) 140 mg/L Nil
Bicarbonate (HCO3) 153 mg/L Nil
Sulphate (SO4) 49 mg/L Nil
SDI <3