Industrial wastewaters recycle reuse and reclamation of the Earth’s hottest spot: the Lut Desert. Meeting all industrial water demands of a 500,000 ton rolling mill plant .by taking advantage of state of the art water and waste water technologies employed by Absun Palayesh Co.

Owner / Client / Consultant:

Bardsir Rolling Mill Complex / Sirjan Jahan Steel Company (SJSCO) / Canymes Company (Iran) – PEREET (India)

Location / Completion Year / Duration: Bardsir – Kerman Province – Iran / 2017 / 8 month

Contract Type: EPC

Represented Solution in This Project:

Main Solution:

  • Industrial Wastewater Reuse

Supplementary Solutions:

  • Building and Infrastructure / Civil works, including: buildings, shed and land escapes
  • Hydraulic Structure /Concrete reservoir, basins and thickeners
  • Cooling Tower /6 Unit Direct & Indirect
  • Pump Station /1 State of the art pump station with 30 pump in 5 different type
  • Electrical and instrument / LV, MV & MCC Panel, accomplished by Absun Madar Co.

Complementary Services:

  • O&M Operation and Maintenance
  • Procurement /Directly from 8 different countries including 15 international companies
  • Laboratory Testing Services / close to 30 time sampling for more than 25 Parameters

Process and Technology:

  • Scale Pit / Capacity: 400 m³
  • Settling basin + Flocculation unit / Capacity: 2785 m³
  • Self-Cleaning Filter / Capacity: 3140 m³/hr.
  • Direct Circuit Cooling Tower / Capacity: 2280 m³/hr.
  • Indirect Circuit Cooling Tower / Capacity: 456 m³/hr.
  • Cooling Tower’s Basin / Capacity: 800+270 m³
  • Sludge Dewatering / Gravitational and Mechanical

Fluid Characteristic:

  Influent Effluent
Ind. Wastewater Treated Water
Capacity 48,000 m³/day 48,000 m³/day
Concentration of solids (iron scale) 1500 mg/L < 0.5 mg/L
Oil (not emulsion) & grease 10-15 mg/L < 1 mg/L
TSS < 30 mg/L
T 43-48 C° 35 C°