ILAM Petrochemical Complex Water Treatment & Wastewater Reuse Plant Project
ILAM Petrochemical Complex Water Treatment & Wastewater Reuse Plant Project
:PROJECT LOCATION
ILAM, IRAN
:AIM OF PROJECT
Designing and Engineering, Procurement, Installation & Construction (EPC) project of complementary water treatment plant and brine reuse plant in ILAM PETROCHEMICAL COMPLEX.
Changing the water supply source of the Petrochemical complex from ILAM Dam to the GHALAL Dam (ILAM Province, IRAN) resulted in changes in inflow water quality which was necessary to modify the existing treatment plant system (Pre-treatment and Reverse Osmosis systems). Also, to manage the water resources and reduction of effluent capacity, the reuse of the brine streams (saline wastewater of all RO systems) was considered in this project.
:SCOPE OF PROJECT
- Main Pre-treatment Plants (RO I & RO II) (13,700 m3/d)
- Main BWRO Desalination Plants (RO I & RO II) (13,700 m3/d)
- Brine Reuse SWRO Desalination Plant (RO III) (2,000 m3/d)
- Product Water Concrete Storage Tank (400 m3)
: SUPPLEMENTARY SCOPE
- LV MCCs
- Automation, Monitoring, Control Systems & Instrumentation
- Hydraulic Structures, Buildings & Sheds, and Landscaping.
- Chemicals & Consuming Materials
: SYSTEM PROCESS
- Main Plant: Sand Filtration > Activated Carbon Filtration > Micro-Filtration (Cartridge Filters) > Reverse Osmosis (BWRO).- Brine Reuse Plant: Micro-Filtration (Cartridge Filters) > Reverse Osmosis (SWRO)